900 Metres Of Mineralised Strike Length Added to Reserve Potential
Amur Minerals Corporation (“Amur” or the “Company”), a far east Russian sulphide nickel copper explorer, is pleased to provide an update on the 2016 drill results from its Maly Kurumkon / Flangovy (“MKF”) drill programme at Kun-Manie.
An early start to the drilling season, combined with higher than planned drill rates, has enabled the Company to complete a total of 54 holes (11,978.3 metres) as of 1 August 2016. A total of 34 resource definition holes have been completed and 2,100 metres of the current MKF 2,500 metre length is now considered to be completely drilled for resource and reserve determination (based on parameters previously used by SRK Consulting Ltd (“SRK”). This 2,100 metre length also includes 400 metres of newly discovered resource extension located at the western limit of the deposit.